PORTFOLIO - CIVIL

Leslie Engineering is in the process of or has completed civil engineering for commercial, residential and government projects. Select a tab to view projects in a specific category. Check our Structural Engineering portfolio.

  • Yakima Riverside Storage

    Yakima Riverside Storage, Yakima, WA

    237-unit mini storage facility including fire truck access.

    Location: University Way, Yakima, WA

    Total Project Size: 2.97 acres

    Total Building Sizes: 35,720 square feet

    Client: Yakima Riverside Storage, LLC

    Architect: N/A (Building design by Betco, Inc.)

    General Contractor: Cobra Construction and Excavating LLC

    Completion Date: fall 2015

  • Hogback Selah Development

    Hogback Selah Development, Selah, WA

    Dollar Tree-and O’Reilly’s Auto Parts Building including 78-stall parking lot and delivery truck access.

    Location: North Wenas Avenue, Selah, WA

    Total Project Size: 1.74 acres

    Total Building Size: 17,185 square feet

    Client: Hogback Development Company

    Architect: Poston Architects, Inc.

    General Contractor: Stephens & Sons Construction, Inc.

    Completion Date: Ongoing construction

  • Dom Warehouse

    Dom Warehouse, Seatac, WA

    Office and Warehouse for Dom Construction including parking lot and frontage improvements along Des Moines Memorial Drive and South 196th Place.

    Location: Des Moines Memorial Drive, Seatac, WA

    Total Project Size: 0.46 acres

    Total Building Size: 9,050 square feet

    Client: Dom Construction, Inc.

    Architect: Design Ark, Inc.

    General Contractor: Dom Construction, Inc.

    Completion Date: Ongoing construction

  • TG Estates

    TG Estates, Ellensburg, WA

    30-lot single family residential development with internal streets and alleys including frontage improvements along Spar Lane and Idaho Avenue – performed in two phases.

    Location: Idaho Avenue, Ellensburg, WA

    Total Project Size: 5.74 acres

    Client: Tyler Glahn

    Developer: Crytyl Enterprises, Inc.

    General Contractor: Crytyl Enterprises, Inc.

    Completion Date: Phase I completed in fall 2015; Phase II in construction

  • DMMD Townhomes

    DMMD Townhomes, King County, WA

    8-unit Townhomes including vehicular, pedestrian and fire truck access, and playground.

    Location: Des Moines Memorial Drive, Seattle, WA

    Total Project Size: 0.33 acres

    Total Building Size: 3,915 square feet

    Client: Vacek Szymula

    Architect: Design Ark, Inc.

    General Contractor: T.B.D.

    Completion Date: In design

  • Ellensburg WA DNR Shop

    Ellensburg WA DNR Shop, Ellensburg, WA

    Warehouse for Washington State Department of Natural Resources including maintenance truck access.

    Location: East Bowers Road, Ellensburg, WA

    Total Project Size: 1.00 acres

    Total Building Size: 3,200 square feet

    Client: Washington State DNR

    Architect: Traho Architects, P.S.

    General Contractor: WA State DNR Field Crew

    Completion Date: In construction

  • WA DFW Wenas Shooting Range

    WA DFW Wenas Shooting Range, Yakima County, WA

    100-yard rifle and 25-yard pistol shooting ranges and trap and skeet shooting range at Bull Pasture site including parking lot and fire truck access and planning for future 200-yard rifle shooting range and conceptual estimate of Sheep Company shooting range site.

    Location: Wenas Wildlife Area, Old Durr Road, Yakima County, WA

    Total Project Size: 5.00 acres

    Client: Washington State Department of Fish and Wildlife

    Architect: Traho Architects, P.S.

    General Contractor: T.B.D.

    Completion Date: Design completed; construction planned to start in fall 2016 or spring 2017

  • Harrison Group B Water System

    Residential Development Group "B" Water System, Yakima, WA

    Group B Water System design for a private 3-lot single family residential development.

    Location: Yakima, WA

  • SOZO Sports Complex – Phase 1.1, City of Yakima, WA

    SOZO Sports Complex – Phase 1.1, City of Yakima, WA

    The project consisted of three grass and three synthetic turf soccer fields with accessory buildings, drive aisles, and parking, including public utilities and Sorenson Road extension to serve the project. This phase of the project addressed some of the sensitive area issues and planned for future phases of SOZO Sports Complex development.

    Location: 4001 Sorenson Road, Yakima, WA

    Total Project Size: 28 acres

    Client: SOZO Sports of Central Washington

    Project Manager: 3D Digital Design & Development

    General Contractor: M Sevigny Construction, Inc.

    Completion Date: In construction

  • East Valley Central Middle School Classroom Addition, Yakima County, WA

    East Valley Central Middle School Classroom Addition, Yakima County, WA

    The project consists of a new classroom building addition to an existing classroom building, rerouting of existing school bus access road to better and more efficiently serve the EVC Middle School and East Valley High School, and the new parking lot.

    Location: 1900 Beaudry Road, Yakima, WA

    Total Project Size: 4.5 acres

    Client: East Valley School District

    Project Manager: Loofburrow Wetch Architects

    General Contractor: T.B.D.

    Completion Date: In design. Construction planned to start at the end of 2016 or beginning of 2017.

  • East Valley Central Middle School Gymnasium Addition, Yakima County, WA

    East Valley Central Middle School Gymnasium Addition, Yakima County, WA

    The project consists of a new gymnasium building addition to an existing gymnasium building, rerouting of existing utilities, and rerouting of existing sidewalks to meet ADA requirements.

    Location: 1900 Beaudry Road, Yakima, WA

    Total Project Size: 1 acre

    Client: East Valley School District

    Project Manager: Loofburrow Wetch Architects

    General Contractor: T.B.D.

    Completion Date: In design. Construction planned to start at the end of 2016 or beginning of 2017.

  • Moxee Elementary School Parking Lot Addition, Yakima County, WA

    Moxee Elementary School Parking Lot Addition, Yakima County, WA

    The project consists of addition of a new asphalt paved parking lot and meeting ADA requirements.

    Location: 1900 Beaudry Road, Yakima, WA

    Total Project Size: 1.5 acre

    Client: East Valley School District

    Project Manager: Loofburrow Wetch Architects

    General Contractor: T.B.D.

    Completion Date: In design. Construction planned to start in July or August 2016

  • Yakima School District Ridgeview Elementary School 2016 Portable Project, City of Yakima, WA

    Yakima School District Ridgeview Elementary School 2016 Portable Project, City of Yakima, WA

    The project consists of addition of a new portable to match existing portable and meeting ADA requirements.

    Location: 609 W. Washington Avenue, Yakima, WA

    Total Project Size: 0.5 acre

    Client: Yakima School District

    Project Manager: Loofburrow Wetch Architects

    General Contractor: Stephens & Sons Construction, Inc.

    Completion Date: In construction