PORTFOLIO - STRUCTURAL

Leslie Engineering is in the process of or has completed structural engineering for educational, medical, residential, wineries, agriculture, religious, historical and commercial projects. Select a tab to view projects in a specific category. Check our Civil Engineering portfolio.

  • Perry Tech

    Plath Hall, Perry Technical Institute, Yakima, WA

    Plath Hall is a two-story structural steel framing with concrete deck classroom building for the Instrumentation Program at Perry Technical Institute.

    Location: West Washington Avenue, Yakima, WA

    Total Project Size: 3.5 acres

    Total Building Size: 36,176 square feet (both stories)

    Client: Perry Technical Institute

    Architect: BORArchitecture, PLLC

    General Contractor: Tri-Ply Construction, LLC

    Completion Date: Summer/Fall 2015

  • YVCC Campus Op

    YVCC Campus Operations, Yakima, WA

    This project consisted of two separate buildings – YVCC Campus Operations Building, which is a single-story, wood framed building with CMU and brick veneer, and Shop, which is a single-story CMU building with structural steel roof and wood framed mezzanine.

    Location: West Prasch Avenue, Yakima, WA

    Total Project Size: 1.7 acres

    Total Building Size: 10,670 square feet (Campus Ops) and 13,103 square feet (Shop)

    Client: Yakima Valley Community College

    Architect: BORArchitecture, PLLC

    General Contractor: Meridian Construction

    Completion Date: Ongoing construction

  • YVCC Toppenish Learning Center

    YVCC Toppenish Learning Center, Toppenish, WA

    Learning Center is a single-story wood frame classroom building for Yakima Valley Community College at Toppenish extension.

    Location: West 3rd Avenue, Toppenish, WA

    Total Project Size: 2.8 acres

    Total Building Size: 7,092 square feet

    Client: Yakima Valley Community College

    Architect: BORArchitecture, PLLC

    General Contractor: M Sevigny Construction, Inc.

    Completion Date: Ongoing construction

  • Yakima Farm Worker’s Clinic

    Yakima Farm Worker’s Clinic, Yakima, WA

    Yakima Farm Worker’s Clinic is a three-story structural steel framed commercial building with structural steel roof decking.

    Location: North Keyes Road, Yakima, WA

    Total Project Size: 3.1 acres

    Total Building Size: 35,118 square feet (all stories)

    Client: Yakima Venture Capital

    Designer: Insignia Design

    Architect: Traho Architects, P.S.

    General Contractor: Paragon Northwest, LLC

    Completion Date: 2014

  • Comprehensive Mental Health

    Adult Evaluation & Treatment Center, Yakima, WA

    Adult E & T Center is a single-story CMU, brick and structural steel frame building with steel roof decking supported by open-web steel joists and structural steel girders used as an examination and treatment facility for Central Washington Comprehensive Mental Health.

    Location: South 2nd Avenue, Yakima, WA

    Total Project Size: 0.8 acres

    Total Building Size: 13,333 square feet

    Client: Central Washington Comprehensive Mental Health

    Architect: BORArchitecture, PLLC

    General Contractor: Tri-Ply Construction, LLC

    .

    Completion Date: Summer/Fall 2014

  • Pear Tree Multi Family

    Pear Tree Place Phase III, Yakima, WA

    Pear Tree Place Phase III was a multi-family residential project consisting of four two-story Structural Insulated Panel (SIP) wall framing with conventional roof and floor framing buildings.

    Location: Powerhouse Road, Yakima, WA

    Total Project Size: 2.7 acres

    Client: Next Step Housing

    Architect: Traho Architects, P.S.

    General Contractor: M.C. Lundgren,Inc.

    Completion Date: 2013

  • Naches Heights Residence

    Naches Heights Residence, Yakima, WA

    Naches Heights Residence is a two-story wood framed single family residence that features high ceilings, large unobstructed clear spans.

    Location: Yakima, WA

    Total Building Size: 10,018 square feet

    Architect: Dave Dykstra Architects

    General Contractor: Artisan, Inc.

    Completion Date: 2014

  • East Valley Residence

    East Valley Residence, Yakima, WA

    East Valley Residence is a single-story wood framed, including some steel framed features, single family residence that features high ceilings, large unobstructed clear spans, cabana, and pool.

    Location: Moxee, WA

    Total Building Size: 4,926 square feet

    Designer: Insignia Design

    General Contractor: Artisan, Inc.

    Completion Date: 2012

  • Hogue

    Hogue Winery Press Platform, Prosser, WA

    This project consisted of raised structural steel framed maintenance platform for wine press equipment access points to facilitate regular crush activities, including compliance with OSHA requirements, at Hogue Winery.

    Location: Wittkopf Loop, Prosser, WA

    Total Platform Size: 1,700 square feet

    Client: Hogue Winery

    Completion Date: Summer/Fall 2012

  • Zirkle Cherry Line

    Zirkle Cherry Line, Selah, WA

    The project consisted of raising the existing roof 12 feet and designing of the new mezzanine area to replace existing mezzanine for the installation of new cherry line for Zirkle Fruit Company.

    Location: Harrison Road, Selah, WA

    Total Building Size: 67,500 square feet

    Client: Zirkle Fruit Company

    General Contractor: Banlin Construction, LLC

    Completion Date: Summer/Fall 2014

  • Stadelman Cherry Line and CA Building

    Stadelman Cherry Line and CA Building, Zillah, WA

    The entire building is a combination cherry line, cold storage, controlled atmosphere, auxiliary structures, machine room, shipping dock, and offices and is a single-story with a mezzanine level concrete tilt-up with steel joists and deck building.

    Location: Meade Drive, Zillah, WA

    Total Building Size: 142,000 square feet

    Client: Stadelman Fruit LLC

    General Contractor: RP Lewis Construction Co.

    Completion Date: In construction

  • St. John the Forerunner Greek Orthodox Monastery Church

    St. John the Forerunner Greek Orthodox Monastery Church, Klickitat County, WA

    St. John’s Monastery church was designed to mimic classic Byzantine architecture, while the structural systems consisted of CMU bearing walls, a wood framed roof with high barrel-vaulted ceilings and a concealed steel moment frame supporting the 50’ tall dome.

    Location: Timmer Lane, Klickitat County, WA

    Total Building Size: 4,500 square feet

    Client: St. John the Forerunner Greek Orthodox Monastery

    General Contractor: Cornerstone Construction

    Completion Date: Ongoing construction

  • St. John the Forerunner Greek Orthodox Monastery Dormitory

    St. John the Forerunner Greek Orthodox Monastery Dormitory, Klickitat County, WA

    St. John’s Monastery dormitory is a three-story CMU and wood framed structure with an underground concrete passageway to the adjacent church that houses 23 nuns.

    Location: Timmer Lane, Klickitat County, WA

    Total Building Size: 18,000 square feet

    Client: St. John the Forerunner Greek Orthodox Monastery

    General Contractor: Cornerstone Construction

    Completion Date: 2012

  • Yakima Capitol Theatre

    Capitol Theatre Stage Evaluation and Strengthening, Yakima, WA

    Capitol Theatre is on the National Register of Historic Places, and this project included evaluating the existing stage structure capacity to support future performances, which involved particularly heavy set equipment, and design of new structural strengthening under the stage.

    Location: South 3rd Street, Yakima, WA

    Client: City of Yakima

    General Contractor: MSI Construction, Inc.

    Completion Date: 2013

  • Toppenish Train Depot

    Toppenish Depot Rehabilitation, Toppenish, WA

    This was a federal aid project that consisted of rehabilitation of existing historical Toppenish Train Depot building including reroofing of wood frame roof and new dormers.

    Location: Asotin Avenue, Toppenish, WA

    Total Building Size: 9,826 square feet

    Client: Yakima Valley Rail & Steam Museum Association

    Architect: Traho Architects, P.S.

    General Contractor: DLT Construction

    Completion Date: Fall 2012

  • Allan Bros Office

    Allan Brothers Office, Naches, WA

    Allan Brothers Office is a single-story wood framed office that is the headquarters for Allan Brothers Fruit.

    Location: Allan Road, Naches, WA

    Total Project Size: 3.7 acres

    Total Building Size: 9,500 square feet

    Client: Allan Brothers Fruit

    Architect: BORArchitecture, PLLC

    General Contractor: Concord Construction

    Completion Date: 2012

  • Lower Valley Credit Union

    Lower Valley Credit Union, Sunnyside, WA

    LVCU is a two-story structural steel framed commercial building with challenging non-orthogonal second floor layout.

    Location: North 9th Street, Sunnyside, WA

    Total Project Size: 0.9 acres

    Total Building Size: 10,243 square feet (both stories)

    Client: Lower Valley Credit Union

    Architect: BORArchitecture, PLLC

    General Contractor: Banlin Construction, LLC

    Completion Date: Summer/Fall 2014

  • Yakima Tennis Club

    YTC Outdoor Clubhouse, Yakima, WA

    The building is a two-story heavy timber and conventional framing clubhouse building for Yakima Tennis Club.

    Location: North 35th Avenue, Yakima, WA

    Total Project Size: 0.2 acres

    Total Building Size: 5,082 square feet (both stories)

    Client: Yakima Tennis Club

    Architect: KDF Architecture, Inc.

    General Contractor: Concord Construction, Inc.

    Completion Date: Summer 2015